The subject of public contract is the Contractor’s obligation: a) to create a final design of DOVIDs based on the design specification provided by the Contracting Authority; b) to create an origination of hot stamping foil with DOVIDs for the banknote, including creation of diffractive security feature design; c) to grant an exclusive license covering the DOVID Design an exclusive license covering the Master and its copies for the use of the sheets for the manufacture of banknote to the extent specified in Article VII to the Draft Contract; d) to produce and deliver the hot stamping foils with DOVIDs to the Contracting Authority, in the amount of 250 000 pcs of DOVIDs; e) to enable to acquire the ownership title to the supplied DOVIDs to the Contracting Authority.
Načítáme seznam příloh…
Seznam zadávací dokumentace je dostupný po přihlášení. Účet zdarma.
Účet zdarma vás zabere minutu — vytvořit účet