Wireline logging including pre-test wireline logs and post-test wireline logs and hydraulic stress measurement (“minifrac”) carried out in a 2.1 km-deep borehole located in a brownfield of former barracks in Litoměřice, Czechia including the provision of two packer sets and processing of the data obtained from these